Sök:

Sökresultat:

3607 Uppsatser om Renovation project - Sida 1 av 241

Renoverings strategier på befintligt fastighetsbestånd?fyra fallstudier om allmän nyttiga fastighetsbolag

Today  Real  estate  companies  face  the  challenge  where  extensive  renovations  on  existinghousing built before 1980 must be performed. Conditions have changed and the housing need performance-­?enhancing measures that meet today's quality. With a current renovation rate,  it  would  take  30  years  to  meet  the  renovation  needs.  The  renovation  rate  must therefore rise dramatically, which requires the real estate companies to act consistently in accordance with commercial principles and in an economically, socially and environmentally responsible way.The  paper  discusses  renovation  strategies  in  four  municipal  housing  companies  in  the Stockholm  suburbs.  The  report  includes  surveys  of  four  ongoing  renovation  projects; Fastighets AB Förvaltaren in Sundbyberg project Hundloken 3, Stiftelsen Signalisten in Solna project Ritorp, Sollentunahem in Sollentuna project Svalgången och Väsbyhem in Upplands Väsby project Dragonvägen. The main purpose of this study was to analyze the practices of redevelopment projects.

Renovering av Säteriet, Råda - Från miljonprogram till attraktivt bostadsområde

The homes that were built in the 60?s - and 70's are now so dilapidated and worn that they need thorough renovations. These renovations are expensive to implement for the landlords, which means that the funding for these renovations can create problems. Currently there are no government subsidies for these renovations. This report will examine how Förbo performed the renovation of Säteriet.

Miljöstyrning i Riksbyggens ombyggnadsprocess med hjälp av Miljöbyggnad

How the renovation of the vast Swedish existing building stock with renovation needs will be performed is considered as decisive in order to achieve the target set by the Swedish government of reducing the energy use by 20 percent by 2020. Consequently, the challenge of the building sector consists in reducing the energy use in the existing building stock but at the same time ensuring that the indoor environmental quality is improved and the cultural values are maintained.So far, there have been a few Renovation projects which strongly have reduced the energy use and at the same time have taken into account the environmental aspects and the cultural values. The main reasons are that there have been few incentives and a lack of routines in order to steer efficiently a ?sustainable renovation?.The participants in a Nordic project on sustainable renovation thought that it would be a strong advantage to link the concept of sustainable renovation to the Miljöbyggnad certification system. Indeed it is trusted by the Swedish building and construction sectors and can provide sustainability targets in order to steer renovation processes.The objective of the master thesis is to show how the Miljöbyggnad certification system could be integrated in practice in the renovation process of Riksbyggen, an organization which administers housing associations (Bostadsrättsföreningar) and build houses.

Alternativa byggsystem för att minska transmissionsförlusterna på miljonprogrammets byggnader

The purpose with this project is to explore and verify three renovating systems for Miljonprogrammet (common expression forbuildings constructed during the years 1965-1975 when over a million houses where built in Sweden) to take measure to thelargely transmission losses of these buildings. Many of the buildings from this period have similar constructions and thereforethe same techniques can be used to renovate several of them. This project only considers the climate scale, although thereare many more factors to concern for to efficient the buildings of Miljonprogrammet.This thesis presents examples of renovations carried out using two of the three renovation systems.The essay presents a reference house of choice on which we apply the three systems and calculate the new U-values,consumption of energy and the investment costs. The new U-values the building is given is matched to the values ofrecommendation for passive houses. Our reference house is a two story apartment building, located in the village ofLammhult, with brick facades at the ends and plaster at the long sides.

LÖNSAMHETSKALKYL AV FUKTSÄKERHETSANSVARIG VID RENOVERING : En fallstudie av ett projekt där ByggaF-metoden har använts

The so called ?ByggaF-method? is a relatively new Swedish method to stop moisture from being built into a building. The method should prevent damages on buildings as a result of mould growth and moisture. The purpose of the method is to include moisture control in the entire constructionprocess, from the projecting phase and all the way to the management phase. Up until now, there is no proof if the method is profitable or not and no studies have been made on the topic.

Renovering av miljonprogrammet till Umeå kommuns nybyggnadskrav för energianvändning

A lot of houses built during the Million Homes Programme are in need of major renovation. Today?s technology and materials are better than in the 60?s and 70?s. Both Swedish government and the European Union have set climate goals regarding energy consumption by 2020 and 2050. Achieving these goals would require better standards in buildings than the Building regulations demands, such as Umeå municipality?s construction requirements for new buildings.The report aims to investigate if a renovation of apartment buildings from the Million Homes Programme can reach Umeå municipality?s construction requirements.

Försäkringsbolags kostnader för reparation av fuktskadade badrum

The purpose of this report is to compile and examine the cost of renovation of moisture-damaged bathrooms, to derive a target price. The target price can then be used by insurance companies to estimate the ultimate cost of future bathroom renovations.       The method is based on the compilation and comparison of the cost of repairs of previous water damage in bathrooms. The calculations compiled based on repair estimates for different insurance losses from one of the leading insurance companies in Sweden.       The result shows the average price per square meter of floor area for different sizes of bathrooms. The average price is the basis for the estimate of future renovation costs of bathrooms. The results further show that the bathroom finishes, area and the distance between the entrepreneur and the location of the renovation have great impact on the final repairing cost.

Utredning av fastighetsel i ett äldre och ett ombyggt flerbostadshus i Gävle

The residential and service sector in Sweden accounts for approximately 38% of the total energy usage and Sweden has an aim to reduce the total energy use by 20% by 2020 compared to 2008, which means residential sector will have to improve energy efficiency. As part of that a law was instituted by the Swedish parliament that all properties must have an Energy Performance Certificate (EPC) to thereby give the property owners a greater insight into energy use in their buildings and propose recommendations for energy-efficiency measures. On the EPC, a value on the building's energy performance in terms of energy use in kWh / m2 per year is declared, of which electricity is a share of it. Instructions on what to include in the amount facility electricity for running the facilities is regulated by the authority for building, Boverket while SVEBY has made an interpretation of the regulations in their report "Brukarindata bostäder" where they have a table on what should be included in the amount and what not to include.This report is a study of two similar apartment buildings, where one of the buildings recently underwent renovation, to see if the declared amount of energy for electricity, in the EPC, is consistent with the measured value, and whether there has been any reduction in facility electricity in the renovated building after the renovation.The result shows that the measured value of the building electricity was 2.6 kWh / m2 per year, 28,8 %, lower than the declared value in the building that have not undergone a renovation. Calculation of values from previous years (2011) by the same percentage of facility electricity as in the results of the measurements, 56.7%, it becomes clear that the declared value for facility electricity in the EPC of the renovated building do not correspond with reality and that there has been an increase in use of facility electricity after the renovation..

Prediktion av villapris och dess faktorers inverkan.

 A villas price depends on several important factors. By statistical data, a mathematical multiple regression model was modeled. The model has important explanatory variables such as living space, renovation year and standard points has been taken into consideration, in order to assess their impact on the final price for private homes.By using a statistical program,Minitab 16, the final model was selected with eight explanatory variables. The regression for this model explains up to 67.3 % of the variation on the final price.The results showed percentage wise that the standard points had the greatest impact on the price, there after renovation year and then living space..

Analys av avvikelser vid ROT-projekt

Projektering vid renoveringsprojekt ser ofta väldigt olika ut och skiljer sig från projekteringen vid nyproduktion. Det är därför svårt att ta fram en mall eller standard för hur produktionen ska genomföras och avvikelser kan lätt uppstå.  Avvikelser som uppstår inom renoveringsprojekt kan visa sig vara väldigt tidskrävande eller i värsta fall leda till stopp inom produktionen och det ställs stora krav på projektörerna som måste ha goda kunskaper inom området. Inom ramen för examensarbetet ingår att identifiera och analysera hur kritiska avvikelser inom renoveringsprojekt uppstår samt hur man ska göra för att hantera detta under ett tidigt skede av renoveringen. Som referensobjekt under examensarbetet används renoveringen av bostadsrättföreningen Kurortsparken i Nynäshamn. Rapporten kommer att analysera de avvikelser som uppstått under produktionen samt ge förslag för hur man kunde ha hanterat projektet och de avvikelser som uppstod annorlunda. .

Projektledares motivation och metod : Med utgångspunkt från Vrooms förväntansteori

In today?s changing environment, creation of projects by organizations has become more common. The problem is, though, that the knowledge of the subject is still limited which causes many projects to fail. This has made it extra important to have a good project manager whocanlead the project in the right direction. While doing this both the project method and the project manager?s motivation are contributing sources.

Viktiga faktorer för Kommunikations- och Informationsflöden inom projekt

  iiiAbstract?We are living in a time of project. Everything becomes project. All development, all efficient,all changes are running as project?.

Projektledning inom mjukvaruutveckling : En studie om betydelsen av teknisk kompetens utifrån projektmedarbetares perspektiv

More than half of the implemented IT-projects go over budget, deadline or simply fail. The processes in an IT-project requires technical competence to be present among the project participants to ensure the achievement of business goals and to make organisations competitive. The success of an IT-project largely depends on the project manager which makes it interesting to further investigate what impact the project manager?s technical competence has on the project. Previous research shows differing opinions whether technical competence is considered important for the project manager to be successful or not.

Från idé till verklighet - En klubblokal

Enköping?s Rugby Club has long lacked a bigger hall to gather their members in, where they can meet and socializes outside trainings and games. Thanks to Enköping?s municipality, The Swedish Inheritance Fund, Swedish Sports Confederation, sponsors and club members the clubhouse will be built out with additional 100 square meters.The project is planned in two phases of which phase one is the buildup of the new clubhouse and phase two is the renovation of the existing part. Phase one started with the first groundbreaking in December 2006 and was finished for the season 2007.

Akustiskt åtgärdsprojekt av en rockmusikklubb där live-musik spelas. Vad kan en audionom bidra med?

Introduction: The number of hearing impairments in Sweden is increasing. The largest increase is seen in ages 25-44. There are reasons to believe that these impairments are noise induced. Leisure time noise is not controlled in the same manner that industrial noise is. An ongoing conflict between city council officials and rock club owners, musicians and music event organizers about sound levels at smaller live music clubs exceeding the national sound level restrictions created the need for an acoustic intervention project.

1 Nästa sida ->